FAI 64 WB over 25TH ST
0.50 E OF BAUGH AVE · County 163, Illinois · Built 1974 · 3 Lanes · 36,450 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.6219, -90.124011
This bridge is in worse condition than 55.3% of bridges in County 163. The average bridge in Illinois is 0 years old; this one is 52 years old.
Nearby Bridges
FAI 64 EB over 25TH STREET
Built 1973
FAI 64 RAMP #167&1 over ST CLAIR AVE/FAU9166
Built 1973
I-64 WB over Metrolink Abandoned RR
Built 1973
I-64 WB over TRRA
Built 1968
I-64 EB over Metrolink Abandoned RR
Built 1973
I-64 EB over TRRA
Built 1968
I-64WB Ramp to 18 over NSRR
Built 1974
I-64 EB over NSRR
Built 1968
FAI 64 EB over Abandoned Roadway C
Built 1974
FAI 64 WB over Abandoned Rdwy C
Built 1968
Bridge Details
- Structure #
- 082016100000000
- Year Built
- 1974
- Length
- 54.3 m (178.1 ft)
- Max Span
- 25.3 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 3
- Daily Traffic
- 36,450
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.