MISSOURI AV/FAU 91 over I-55/64; US 40 WB

1/2 mi W 3RD ST EXIT · County 163, Illinois · Built 1965 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
082013500000000
Year Built
1965
Length
42.4 m (139.1 ft)
Max Span
17.7 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
10
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$600,000
Total Project Cost
$900,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.