ILL 203 NB over SB RAMP TO EB 55/70

0.6 M E E ST LOUIS · County 163, Illinois · Built 1960 · 2 Lanes · 7,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
082002500000000
Year Built
1960
Reconstructed
1999
Length
66.4 m (217.8 ft)
Max Span
22.3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
7,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$536,000
Total Project Cost
$590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.