252ND ST (CH 66) over COPPERAS CREEK

1.5 MI. S. IL 92 · County 161, Illinois · Built 1998 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
081312000000000
Year Built
1998
Length
39.5 m (129.6 ft)
Max Span
15.8 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.