IL 84 over DRAINAGE DITCH

1.4 MI. S. OF I-80 · County 161, Illinois · Built 1996 · 2 Lanes · 5,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
081202500000000
Year Built
1996
Length
16.4 m (53.8 ft)
Max Span
4.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
5,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.