ANDALUSIA RD over SAND CREEK
2 MI W OF US 67 · County 161, Illinois · Built 1975 · 2 Lanes · 6,500 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
41.443494, -90.606125
This bridge is in worse condition than 85.7% of bridges in County 161. The average bridge in Illinois is 0 years old; this one is 51 years old.
Nearby Bridges
IL 92 NB (CENT FRW over MILL CREEK
Built 1960
IL 92 SB (CENT FRW over MILL CREEK
Built 1960
ANDALUSIA RD over KYTE CREEK
Built 1987
ILL ROUTE 92 over WARREN CREEK
Built 1975
ANDALUSIA RD over DRAINAGE DITCH
Built 2001
85 TH AVE W over WARREN CREEK
Built 1985
IL 92 NB (CENT FRW over FAI 280
Built 2012
IL 92 SB (CENT FRW over FAI 280
Built 2012
FAI 280 EB over IAIS RR
Built 1968
FAI 280 WB over IAIS RR
Built 1968
Bridge Details
- Structure #
- 081200600000000
- Year Built
- 1975
- Length
- 12.8 m (42 ft)
- Max Span
- 6.7 m
- Width
- 27.6 m (90.6 ft)
- Lanes
- 2
- Daily Traffic
- 6,500
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $437,000
- Total Project Cost
- $656,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.