US RT 67 over C CHANNEL ROCK RIVER

N EDGE MILAN · County 161, Illinois · Built 1948 · 4 Lanes · 10,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

41.455714, -90.573997

This bridge is in worse condition than 54% of bridges in County 161. The average bridge in Illinois is 0 years old; this one is 78 years old.

Nearby Bridges

Bridge Details

Structure #
081003900000000
Year Built
1948
Reconstructed
1985
Length
120.4 m (395 ft)
Max Span
33 m
Width
19.1 m (62.7 ft)
Lanes
4
Daily Traffic
10,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.