FAI 80 SB over I-88 & IL 92
2.5 MI NE SILVIS · County 161, Illinois · Built 1965 · 2 Lanes · 16,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.536058, -90.341769
This bridge is in worse condition than 54% of bridges in County 161. The average bridge in Illinois is 0 years old; this one is 61 years old.
Nearby Bridges
FAI 80 NB over I-88 & IL 92
Built 1965
FAI 80 over STREAM
Built 1965
207TH ST over DRAINAGE DITCH
Built 1986
I-88 over STREAM
Built 1977
SBI3(OLD IL2&92 FR over waterway
Built 1995
MOLINE RD (FAS 120 over I-88
Built 1976
FAI 80 SB over BN RAIL ROAD
Built 2014
FAI 80 NB over BN RAIL ROAD
Built 2016
TR 71 over DRAINAGE DITCH
Built 1985
FAI 80 SB over BARSTOW ROAD
Built 2014
Bridge Details
- Structure #
- 081001200000000
- Year Built
- 1965
- Reconstructed
- 2008
- Length
- 59.6 m (195.5 ft)
- Max Span
- 17.7 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 2
- Daily Traffic
- 16,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $263,000
- Total Project Cost
- $316,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.