TR 3 over TRIB TO HURRICANE CR

2.5 MI E OF WAKEFIEL · County 159, Illinois · Built 2008 · 2 Lanes · 35 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
080321400000000
Year Built
2008
Length
11.1 m (36.4 ft)
Max Span
10.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
35
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.