ILL 150 over MISS RIV/FAU 9416
AT CHESTER - MoDOT · County 157, Illinois · Built 1942 · 2 Lanes · 6,250 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
37.902533, -89.836919
This bridge is in worse condition than 93.3% of bridges in County 157. The average bridge in Illinois is 0 years old; this one is 84 years old.
Nearby Bridges
MO 51 S over KASKASKIA ST MISSISSI
Built 1942
MO 51 S over KASKASKIA ST MISSISSI
Built 2024
MO 51 S over HORSE ISLAND CHUTE
Built 1942
MO 51 S over HORSE ISLAND CHUTE
Built 2024
TR 327 over PATTEN BRANCH
Built 1982
FAS 849 CH 1 over GRAVEL CREEK
Built 1973
TR 122A over GRAVEL CREEK
Built 1983
ILL 3 over MARYS RIVER
Built 1933
TR 311 over TRIB TO MARYS RIVER
Built 1976
TR 108 over TRIB TO GRAVEL CK
Built 1991
Bridge Details
- Structure #
- 079600100000000
- Year Built
- 1942
- Reconstructed
- 1946
- Length
- 861.7 m (2827.1 ft)
- Max Span
- 204.2 m
- Width
- 6.9 m (22.6 ft)
- Lanes
- 2
- Daily Traffic
- 6,250
- Material
- Steel Continuous
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,460,000
- Total Project Cost
- $3,806,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.