CH 11(FAS 254) over CLEAR CREEK

NE-9-T31NR1W · County 155, Illinois · Built 2008 · 2 Lanes · 700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

41.176797, -89.233692

This bridge is in worse condition than 28% of bridges in County 155. The average bridge in Illinois is 0 years old; this one is 18 years old.

Nearby Bridges

Bridge Details

Structure #
078311600000000
Year Built
2008
Length
24.8 m (81.4 ft)
Max Span
24 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.