TR 306 over BUCK BRANCH

.25 SW NEBO · County 149, Illinois · Built 1948 · 1 Lanes · 25 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
075500500000000
Year Built
1948
Length
11 m (36.1 ft)
Max Span
5.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
25
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$9,000
Total Project Cost
$11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.