TR 98 over HADLEY CR TRIBUTARY

0.5 MI S BARRY · County 149, Illinois · Built 1900 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
075306900000000
Year Built
1900
Length
8.5 m (27.9 ft)
Max Span
4 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$40,000
Total Project Cost
$60,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.