ILL 96 over BREWSTER CREEK

2MI SE NEW CANTON · County 149, Illinois · Built 2008 · 2 Lanes · 1,100 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
075250800000000
Year Built
2008
Length
13.8 m (45.3 ft)
Max Span
12.8 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.