FAS 2599 over PIGEON CREEK

2.6M W IL 96 · County 149, Illinois · Built 1994 · 2 Lanes · 350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
075015800000000
Year Built
1994
Length
78.4 m (257.2 ft)
Max Span
21.3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.