FAI 72 EB over BEEBE CREEK

3.4 MI W BARRY INT · County 149, Illinois · Built 1988 · 2 Lanes · 4,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
075010000000000
Year Built
1988
Length
51.6 m (169.3 ft)
Max Span
19.3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
4,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.