US 54 over PLUM POINT SLOUGH

5.2M SW IL 96 · County 149, Illinois · Built 1928 · 2 Lanes · 3,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
6
Satisfactory

Bridge Details

Structure #
075002200000000
Year Built
1928
Reconstructed
1976
Length
10.1 m (33.1 ft)
Max Span
9.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
3,100
Material
Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.