FAS 538(CH 5) over GOOSE CREEK DRAIN D

1.8 MI S OF DELAND · County 147, Illinois · Built 1992 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
074326800000000
Year Built
1992
Length
34 m (111.5 ft)
Max Span
12.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.