CH 23 over BRUSHY CREEK

NE COR SEC 3-7-4 · County 145, Illinois · Built 1988 · 2 Lanes · 225 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
073314700000000
Year Built
1988
Length
35 m (114.8 ft)
Max Span
17.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
225
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.