US 51 over COLLIER CREEK

N OF NCL TAMAROA · County 145, Illinois · Built 2024 · 2 Lanes · 2,300 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
073200800000000
Year Built
2024
Length
7.5 m (24.6 ft)
Max Span
3.7 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
2,300
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.