PFEIFFER RD-TR 25 over BR LA MARSH CREEK

NC1NENE114 33 T8NR7E · County 143, Illinois · Built 1980 · 2 Lanes · 950 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
072550700000000
Year Built
1980
Length
35.7 m (117.1 ft)
Max Span
11 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
950
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.