FAS 386 (TAYLOR RD over KICKAPOO CREEK
SW1/4 19 KICKAPOO TW · County 143, Illinois · Built 1977 · 2 Lanes · 3,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
40.741156, -89.748461
This bridge is in worse condition than 58.4% of bridges in County 143. The average bridge in Illinois is 0 years old; this one is 49 years old.
Nearby Bridges
FAS 386 (TAYLOR RD over KICKAPOO CR OVERFLOW
Built 1977
ILL 8 over KICKAPOO CR. TRIB.
Built 1995
IL 8 over BN RR (072537K)
Built 2023
POWDER MILL RD over BR KICKAPOO CK
Built 2009
ILL 8 over KICKAPOO CREEK
Built 2015
ILL 8 over WARSAW RUN
Built 1996
ILL 8 over TRIB OF KICKAPOO CR
Built 1928
ILL 8 over TRIB OF KICKAPOO CR
Built 1928
GILLES RD over I-74
Built 1963
KRAMM ROAD over KICKAPOO CREEK
Built 1998
Bridge Details
- Structure #
- 072309200000000
- Year Built
- 1977
- Length
- 86.6 m (284.1 ft)
- Max Span
- 22.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $590,000
- Total Project Cost
- $885,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.