FAU-6577 (MaxwellR over C&NW RR (175614U)

SW1/4-10-LIMESTONE · County 143, Illinois · Built 1968 · 2 Lanes · 3,150 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
072307200000000
Year Built
1968
Reconstructed
2024
Length
95.8 m (314.3 ft)
Max Span
36.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
3,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.