RAMP B-3 over DRY RUN CREEK

US150 I74 Rmp Peoria · County 143, Illinois · Built 2007 · 1 Lanes · 6,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
072203000000000
Year Built
2007
Length
12.5 m (41 ft)
Max Span
5.7 m
Lanes
1
Daily Traffic
6,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.