MAHER RD-CH 25R over I-74

BRIMFIELD INTERCH. · County 143, Illinois · Built 1968 · 2 Lanes · 2,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
072007600000000
Year Built
1968
Reconstructed
2022
Length
78.1 m (256.2 ft)
Max Span
23.9 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
2,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.