WB I-74 over UP RR (175624A)
.25 MI W PEORIA · County 143, Illinois · Built 1965 · 2 Lanes · 16,250 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.740258, -89.655758
This bridge is in worse condition than 58.4% of bridges in County 143. The average bridge in Illinois is 0 years old; this one is 61 years old.
Nearby Bridges
EB I-74 over UP RR (175624A)
Built 1965
I-74 over BIG HOLLOW CREEK
Built 1965
RICHWOODS BLVD over BIG HOLLOW CREEK
Built 2019
FAI 474 RMP #109 over EB I-74
Built 1978
SB ILL 6 over WB I-74
Built 1978
FAI 474 RMP 109 over WB I-74
Built 1978
FAI 474 RMP 1.18 over EB I-74
Built 1978
I-474 RMP1.18 over WB I-474
Built 1978
WB I-474 over EB I-74
Built 1979
ILL 8 over BIG HOLLOW CREEK
Built 2010
Bridge Details
- Structure #
- 072000200000000
- Year Built
- 1965
- Reconstructed
- 2012
- Length
- 48.5 m (159.1 ft)
- Max Span
- 18.3 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 16,250
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $749,000
- Total Project Cost
- $1,124,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.