EAGLE POINT RD over BUFFALO CREEK

0.5 MI W POLO · County 141, Illinois · Built 1962 · 2 Lanes · 375 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
071301100000000
Year Built
1962
Length
11.3 m (37.1 ft)
Max Span
10.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
375
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.