IL ROUTE 64 over DITCH

3.25 MI E OF IL 2 · County 141, Illinois · Built 2005 · 2 Lanes · 3,900 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
071202500000000
Year Built
2005
Length
9.3 m (30.5 ft)
Max Span
4.5 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
3,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.