FAP 758(IL 32) over JONATHAN BRANCH

1.3 MI S LOVINGTON · County 139, Illinois · Built 1975 · 2 Lanes · 1,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
070003300000000
Year Built
1975
Reconstructed
2007
Length
15.3 m (50.2 ft)
Max Span
14.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,350
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$190,000
Total Project Cost
$222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.