IL 121 (FAP 320) over JONATHAN CREEK

3 MI E OF SULLIVAN · County 139, Illinois · Built 1967 · 2 Lanes · 5,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
070000300000000
Year Built
1967
Length
68 m (223.1 ft)
Max Span
25.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
5,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$963,000
Total Project Cost
$1,124,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.