FAP 745(IL 104) over Washington St
Meredosia · County 137, Illinois · Built 2018 · 2 Lanes · 2,800 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.831411, -90.561486
This bridge is in worse condition than 15.8% of bridges in County 137. The average bridge in Illinois is 0 years old; this one is 8 years old.
Nearby Bridges
IL 104 over Illinois River
Built 2018
IL 104 over MCGEE DRAINAGE DITCH
Built 1988
IL 99 over MCGEE DRAINAGE DITCH
Built 1987
TR 4 over WILLOW CREEK
Built 1995
TR 8 over WILLOW CREEK
Built 2012
IL 104 over MARTIN CREEK
Built 1934
TR 57 over COON RUN CREEK
Built 1968
US 67 ILL 100 & 1 over COON RUN
Built 1970
TR 216 over MARTIN BRANCH
Built 1998
US 67 & ILL 100 over WILLOW CREEK
Built 1997
Bridge Details
- Structure #
- 069052200000000
- Year Built
- 2018
- Length
- 19.9 m (65.3 ft)
- Max Span
- 18.1 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,800
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.