TR 297 over DRY FORK

2 MI NW FILLMORE · County 135, Illinois · Built 1985 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
068327700000000
Year Built
1985
Length
26.4 m (86.6 ft)
Max Span
8.5 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
75
Material
Concrete
Design
Channel Beam
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.