TR 324 over CREEK

2.5 MI SW FILLMORE · County 135, Illinois · Built 1900 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
068318600000000
Year Built
1900
Length
6.7 m (22 ft)
Max Span
6.4 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.