TR 199 over STREAM

4.0 MI N HILLSBORO · County 135, Illinois · Built 1900 · 1 Lanes · 75 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
068314500000000
Year Built
1900
Reconstructed
1976
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
4.7 m (15.4 ft)
Lanes
1
Daily Traffic
75
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.