ILL 159 over PRAIRIE DU LONG CRK

3 M S HECKER · County 133, Illinois · Built 1928 · 2 Lanes · 4,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
067000700000000
Year Built
1928
Reconstructed
1954
Length
31.2 m (102.4 ft)
Max Span
15.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
4,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$494,000
Total Project Cost
$528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.