TR 218 over CAMP CREEK

SE-16-T15N R2W · County 131, Illinois · Built 2023 · 2 Lanes · 225 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
066521500000000
Year Built
2023
Length
7.6 m (24.9 ft)
Max Span
3.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
225
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.