TR 165 over STURGEON BAY

NW-19-T14NR5W · County 131, Illinois · Built 1980 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
066501200000000
Year Built
1980
Length
61 m (200.1 ft)
Max Span
22.9 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
50
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.