FAS 212 (CH 9) over CAMP CREEK

NW-8-T14NR4W · County 131, Illinois · Built 2018 · 2 Lanes · 325 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
066316500000000
Year Built
2018
Length
36.6 m (120.1 ft)
Max Span
12.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
325
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.