US 67 over POPE CREEK

3 MI S OF VIOLA · County 131, Illinois · Built 2024 · 2 Lanes · 2,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 9 Excellent
Substructure 9 Excellent

Location

41.158075, -90.587772

This bridge is in worse condition than 28.8% of bridges in County 131. The average bridge in Illinois is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
066001900000000
Year Built
2024
Length
42.9 m (140.7 ft)
Max Span
22.7 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
2,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.