WALDO CHURCH ROAD over TRIB TO FOUR MILE CREEK

1.5 MI NE METROPOLIS · County 127, Illinois · Built 2023 · 2 Lanes · 125 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
064315600000000
Year Built
2023
Length
19.8 m (65 ft)
Max Span
19 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
125
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.