MARION ROAD over BEAR CREEK
1 MI S BIG BAY · County 127, Illinois · Built 1968 · 2 Lanes · 75 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.302936, -88.723003
This bridge is in worse condition than 67.4% of bridges in County 127. The average bridge in Illinois is 0 years old; this one is 58 years old.
Nearby Bridges
TR 23 over TRIB TO BEAR CREEK
Built 1993
TR 82 over ICG RR
Built 1900
TR78A-HARRY WEBER over NEW COLUMBIA DITCH
Built 1900
I-24 RAMP 260 over NEW COLUMBIA DITCH
Built 1978
FAS 957 BIG BAY over INTERSTATE 24
Built 1971
I 24 EB over NEW COLUMBIA DITCH
Built 1971
I 24 WB over NEW COLUMBIA DITCH
Built 1971
TR 82 over TRIB-GURLEY DITCH
Built 2002
I-24 WB over BEAR CREEK
Built 2024
I-24 EB over BEAR CREEK
Built 2023
Bridge Details
- Structure #
- 064303000000000
- Year Built
- 1968
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 75
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.