TR 158 over FURRER DITCH

2 MI NE EASTON · County 125, Illinois · Built 1983 · 2 Lanes · 25 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 8 Very Good

Location

40.257147, -89.818847

This bridge is in worse condition than 50% of bridges in County 125. The average bridge in Illinois is 0 years old; this one is 43 years old.

Nearby Bridges

Bridge Details

Structure #
063361300000000
Year Built
1983
Length
15.2 m (49.9 ft)
Max Span
14.5 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.