TR 69A (TH-C65) over JUDD CREEK

T30N-R1E-3PM SEC 29 · County 123, Illinois · Built 1977 · 2 Lanes · 75 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
062454800000000
Year Built
1977
Length
12.5 m (41 ft)
Max Span
3.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
75
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.