CH-3 (CH-S42) over S BRANCH CROW CREEK

T29N-R1W-3PM SEC 21 · County 123, Illinois · Built 2018 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
062376200000000
Year Built
2018
Length
39.9 m (130.9 ft)
Max Span
22.2 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.