CH 13 (CH-R60) over CROW CREEK

T13N-R8E-4PM SEC 10 · County 123, Illinois · Built 1971 · 2 Lanes · 450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
062336000000000
Year Built
1971
Length
18.6 m (61 ft)
Max Span
8.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
450
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.