ILL 29 over ILL RIVER TRIB

0.63MI N PEO CO LINE · County 143, Illinois · Built 1953 · 2 Lanes · 5,350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
062001000000000
Year Built
1953
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
5,350
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.