TR 218C over VERMILION CREEK
0.5 MI W SALEM · County 121, Illinois · Built 1985 · 2 Lanes · 600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.643319, -88.97705
This bridge is in worse condition than 37.8% of bridges in County 121. The average bridge in Illinois is 0 years old; this one is 41 years old.
Nearby Bridges
FAS-1787 over VERMILLION CREEK
Built 1909
BOONE ST RD (TR 19 over FAI-57
Built 1968
TR-219 over VERMILION CREEK
Built 1909
FAI-57 SB over US-50
Built 1968
FAI-57 NB over US 50 (FAP-99)
Built 1968
CH-20 TONTI RD over FAI-57
Built 1967
CH-20 over DAVIDSON CREEK
Built 1989
I-57 SB over CSXRR
Built 1968
US 50 over VERMILLION CREEK
Built 1994
I-57 NB over CSXRR
Built 1969
Bridge Details
- Structure #
- 061323600000000
- Year Built
- 1985
- Length
- 12.5 m (41 ft)
- Max Span
- 11.6 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.