PIERCE LN/FAU 8985 over ROCKY FORK CK
1.8MI NW ALTON · County 119, Illinois · Built 2010 · 2 Lanes · 2,800 vehicles/day
Overall
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
38.946014, -90.214117
This bridge is in worse condition than 18.9% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 16 years old.
Nearby Bridges
STAMPER LN/ MSS 11 over ROCKY FORK
Built 1967
IL 255 SB over UPRR KCSRR
Built 2009
IL 255 NB & Ramp C over UPRR KCSRR
Built 2010
ALBY RD/ FAU 8988 over COAL BR
Built 1979
IL 255 NB - FAP 31 over IL 111/IL 267
Built 2012
IL 255 SB - FAP 31 over IL 111/IL 267
Built 2012
IL 255 SB over HUMBERT RD (CH 4)
Built 2012
IL 255 NB over HUMBERT RD (CH 4)
Built 2012
IL 111 / IL 267 over N Trib to Rocky Fork
Built 2014
US 67 NB over IL 255 NB & SB
Built 2012
Bridge Details
- Structure #
- 060690200000000
- Year Built
- 2010
- Length
- 11.5 m (37.7 ft)
- Max Span
- 11.5 m
- Width
- 17 m (55.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,800
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.