TR 281A-Timber Rid over Trib to Wendell Branch

0.6 Mi E of Troy · County 119, Illinois · Built 2023 · 2 Lanes · 25 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
060337200000000
Year Built
2023
Length
8 m (26.2 ft)
Max Span
7.7 m
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.