FAS 737/SEILER RD. over HONEYCUT BRANCH
1.2 MI W FOSTERBURGM · County 119, Illinois · Built 1977 · 2 Lanes · 475 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
38.972867, -90.104928
This bridge is in worse condition than 77.3% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 49 years old.
Nearby Bridges
TR 55 over HONEYCUT BRANCH
Built 1986
STRAUBE LN/ TR 21A over W. FORK WOOD RIVER
Built 1990
FAS 737 over WEST FK WOOD RIVERCK
Built 1964
FAS 737 over SEILER CREEK
Built 1964
TR 80 WOLF RD over LICK BR
Built 2008
WOOD STATION RD/TR over W FK WOODRIVER CREEK
Built 2002
WOOD STATION RD TR over IL 255 - FAP 310
Built 2005
IL 255 SB over WEST FK WOODRIVER CK
Built 2006
IL 255 NB over WEST FK WOODRIVER CK
Built 2006
TR 21 over TRIB W FRK W R CRK
Built 1988
Bridge Details
- Structure #
- 060322500000000
- Year Built
- 1977
- Reconstructed
- 2006
- Length
- 35.5 m (116.5 ft)
- Max Span
- 11.2 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 475
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $513,000,000
- Total Project Cost
- $527,400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.